featured project

DENTAL BOUTIQUE LILYDALE

Dental Boutique was founded in 2013, with a simple yet powerful vision to reimagine what dentistry could feel like. It is a place where patients feel safe, understand, and supported, without judgement. 

Dental Boutique has now grown from a single clinic in Melbourne to a network of location across Melbourne, Sydney, Brisbane, Gold Coast, Sunshine cost and many more – caring for more than 150,000 patients along the way.

DENTAL BOUTIQUE, LILYDALE-DEMOLITION PROJECT

TCB DEMOLITION UNDERTOOK THE COMPREHENSIVE INTERIOR DEMOLITION OF THE DENTAL BOUTIQUE IN LILYDALE. THE WORKS INCLUDED

  • REMOVAL OF EXISTING SHOPFRONT ELEMENTS, 
  • REMOVAL OF JOINERIES
  • REMOVAL OF FLOOR AND WALL FINISHES
  • REMOVAL OF TOILET FIXTURES
PROJECT 2026

715 SWANSTON STREET CARLTON

TCB Demolition & Construction Pty Ltd successfully delivered an internal demolition and strip-out project at 715 Swanston Street.

The scope of works included the removal of plasterboard partition walls, existing carpet and vinyl floor coverings, and associated internal fixtures. The project also involved more complex structural elements, including the demolition of stairs using controlled saw cutting methods, removal of existing handrails, and precise saw cutting to the lift shaft to facilitate future modifications.

Our team executed the works with a strong focus on safety, precision, and site control, particularly when undertaking structural cutting activities. Careful planning and sequencing ensured that all demolition activities were carried out efficiently while maintaining the integrity of surrounding structures.

The project was delivered with an emphasis on cleanliness, effective waste management, and minimal disruption, ensuring the site was safely and efficiently prepared for the next stage of construction.

PROJECT 2026

FRV BRUNSWICK BEDROOM REFURBISHMENT

TCB Demolition & Construction Pty Ltd successfully delivered the internal demolition works for the FRV Brunswick Fire Station Bedroom Refurbishment.

The scope of works included the demolition of existing block walls and the creation of new structural openings within masonry walls to accommodate the refurbishment layout. Additional works involved the removal of carpet and floor finishes, demolition of internal partition walls, and strip-out of associated fixtures and fittings.

Due to site constraints within an operational fire station, all demolition waste was carefully managed and removed via a controlled bin chute system, ensuring safe and efficient material handling with minimal disruption to ongoing emergency services operations.

Our team executed the works with a strong emphasis on safety, coordination, and cleanliness, maintaining strict site management protocols throughout the project. The works were completed efficiently, preparing the area for the next stage of construction while ensuring the facility remained functional and compliant during the refurbishment process.

PROJECT 2026

L11 FUTURA CAPITAL

TCB Demolition & Construction Pty Ltd successfully completed an internal demolition and strip-out project at L11 Futura Capital. The scope of works included the removal of existing glass panel, railings, staircase tread and nosing, andsupports. Our team carefully dismantled internal elements while maintaining strict safety and site management standards, ensuring the space was efficiently prepared for the next stage of refurbishment. The project was delivered with a strong focus on cleanliness, waste management, and minimal disruption within the commercial environment.